Mining Thickener Tank Detail Engineering
A metal mining operation needed to increase solids in the molybdenum concentrate produced by the existing molybdenum flotation plant in order to optimize operation of an existing larox filter.
A metal mining operation needed to increase solids in the molybdenum concentrate produced by the existing molybdenum flotation plant in order to optimize operation of an existing larox filter.
A metal mining operation needed to replace an existing wet grinding and classification circuit that was at the end of its operational life with two new Vertimill grinding mills, pumping stations, and hydrocyclone classifiers.
A lime industry client wanted to establish a new processing plant at an existing operation to produce a new product to meet market demand.
PENTA has been completing lime kiln upgrade projects on an EPCM basis working closely together with all project stakeholders for a successful project completion.
PENTA completed this project to replace two portable transloaders used to transfer cement from rail cars to cement trucks with a permanent rail-to-truck terminal…
PENTA has been completing lime kiln construction projects on an EPCM basis working closely with our clients’ project teams.
A Cement Producer wanted to build a $300 Million Greenfield 3000 mtpd Clinker Line in Jamaica and engaged PENTA to complete the project on an EPCM basis.
Discover how PENTA’s tailored solutions can solve your toughest challenges. Reach out for expert guidance today.
Corporate Headquarters
10123 Corporate Square
St. Louis, MO 63132, USA
Western United States Office
5151 E Broadway Blvd, Suite 1600
Tucson, AZ 85711, USA
Eastern United States Office
555 North Point Center East
Alpharetta, GA 30022, USA
India Office
Office No. 902 & 903 Ellora Fiesta
Plot No. 8, Sector 11
Opp. Juinagar Railway Station Sanpada, Navi Mumbai 400705, INDIA
© Copyright – Penta Engineering Corporation
"*" indicates required fields