Mining Thickener Tank Detail Engineering
A metal mining operation needed to increase solids in the molybdenum concentrate produced by the existing molybdenum flotation plant in order to optimize operation of an existing larox filter.
A metal mining operation needed to increase solids in the molybdenum concentrate produced by the existing molybdenum flotation plant in order to optimize operation of an existing larox filter.
A metal mining operation needed to replace an existing wet grinding and classification circuit that was at the end of its operational life with two new Vertimill grinding mills, pumping stations, and hydrocyclone classifiers.
A lime industry client wanted to establish a new processing plant at an existing operation to produce a new product to meet market demand.
A copper mining client wanted to increase overall raffinate flow to provide uninterrupted leaching with a safe and efficient pumping and distribution system to a new leach pad.
Conversion of existing long dry kiln to a preheater/precalciner kiln and increasing the plant capacity from 1500 Mtpd to 2400 Mtpd clinker, which was part of a larger modernization for the Holcim Hagerstown, MD Cement Plant.
Discover how PENTA’s tailored solutions can solve your toughest challenges. Reach out for expert guidance today.
Corporate Headquarters
10123 Corporate Square
St. Louis, MO 63132, USA
Western United States Office
5151 E Broadway Blvd, Suite 1600
Tucson, AZ 85711, USA
Eastern United States Office
555 North Point Center East
Alpharetta, GA 30022, USA
India Office
Office No. 902 & 903 Ellora Fiesta
Plot No. 8, Sector 11
Opp. Juinagar Railway Station Sanpada, Navi Mumbai 400705, INDIA
© Copyright – Penta Engineering Corporation
"*" indicates required fields