Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

PENTA FEATURED

EPC Storage Dome

LOCATION

Midwest

CLIENT

Cement Industry Client

SOLUTION

Storage Domes, Silos and Bins

INDUSTRY

Cement

Overview

A Midwestern Cement Industry Client required an additional 90,000 tons of cement storage for their plant operations. The client received a recommendation from another firm to install a storage dome in a location that would have been a significant distance from the plant causing less efficient logistical operations and increased energy costs to transport cement to the dome. PENTA was engaged by the client to complete the EPC Storage Dome Project and was able to site the dome in a much closer location to the plant’s existing operations.

 

cement plant storage dome - PENTA Engineering Company

Result

PENTA’s EPC scope of services included completion of detail engineering (civil/structural, mechanical and electrical engineering), procurement of labor, equipment and materials, all construction (civil/earthwork, mechanical erection, electrical installation), and startup and commissioning.

 

Siting the storage dome closer to existing plant operations resulted in $1,000,000 in project and operational savings by not having to relocate roads and not having higher energy requirements to transport the cement over a longer distance.

PENTA FEATURED

RECENT PROJECTS

Ash Classification System EPCM

A Western United States diversified construction materials group wanted to integrated Type F fly ash into their business to meet ash demand.

Waste-To-Fuel-Manufacturing-Facility

EPCM Waste-To-Fuel Facility

PENTA was engaged to develop a waste-to-fuel production facility that produces a fuel source that can be used in calcination as a substitute for fossil fuels.

READY TO
OPTIMIZE
YOUR INDUSTRIAL OPERATIONS?

Discover how PENTA’s tailored solutions can solve your toughest challenges. Reach out for expert guidance today.