Overview

PENTA provided basic and detail engineering for the installation of a fly ash handling system at an existing power plant to dispatch over one million short tons of dry fly ash per year by rail and truck. PENTA developed the design accounting for plant operating and logistics requirements. Since the project was at an existing plant operation, 3D scanning was performed along with survey and geotechnical investigation. Engineering included civil, structural, mechanical and electrical design, equipment evaluation and recommendation, construction bid package development and evaluation with Client approval. PENTA also developed project schedule and EPC project budget. The fly ash handling system consisted of pneumatic conveying and mechanical conveying via bucket elevator transporting the fly ash from the existing fly ash silos to a new silo capable of loading both railcars and trucks simultaneously.

Design of a System to Transpsort Fly Ash

PENTA FEATURED

RECENT PROJECTS

Ash Classification System EPCM

A Western United States diversified construction materials group wanted to integrated Type F fly ash into their business to meet ash demand.

Waste-To-Fuel-Manufacturing-Facility

EPCM Waste-To-Fuel Facility

PENTA was engaged to develop a waste-to-fuel production facility that produces a fuel source that can be used in calcination as a substitute for fossil fuels.

READY TO
OPTIMIZE
YOUR INDUSTRIAL OPERATIONS?

Discover how PENTA’s tailored solutions can solve your toughest challenges. Reach out for expert guidance today.

Join Penta’s Mailing List.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.